River basins by slope of triangle
VI
SA
SB
VJ SC VK
Tipping toward SA VK > (VI+ VJ) / 2
Tipping toward SB VK < (VI + VJ) / 2 and VI < VJ
Tipping toward SC VK < (VI + VJ) / 2 and VI > VJ
VA VB
VA = 100
VB = 120 VE
VC = 150
VD = 140
VC VD
Therefore VE < (VB+VD)/2 and VB > VD (not possible)
VA VB
VA = 100 VE
VB = 120
VC = 150
VD = 140
VC VD
Therefore VE < (VB+VD)/2 and VD < VB
VE < 130
VE < (VC+VD)/2 and VC > VD
VE < 145
VE < (VC+VA)/2 and VA > VC (not possible)
VA VB
VA = 100 VE
VB
= 120
VC = 150
VD = 140
VC VD
Therefore VE < (VB+VD)/2 and VD < VB
VE < 130
VE < (VC+VD)/2 and VC > VD
VE < 145
VE < (VC+VA)/2 and VC > VA
VE < 125
VE > (VA+VB)/2
VE > 110
Valid configuration for 110 < VE < 125
VA VB
VA = 100 VE
VB = 120
VC = 150
VD = 140
VC VD
Therefore VE < (VB+VD)/2 and VD < VB
VE < 130
VE < (VC+VD)/2 and VC > VD
VE < 145
VE > (VC+VA)/2
VE > 125
VE > (VA+VB)/2
VE > 110
Valid configuration for 125 < VE < 130